Well its Friday in Bradley Beach.
Today story is Out with the old and In with the New! Lets keep cool.
So The Rover was out early to see the world of his little hamlet, car and trucks, trains and buses, people on the move so the rover went over to have a cup of joe as he was sitting up though the sky came a bird no, a plane no, a flying HVAC unit on a crane! That what I was seeing a large crane with a long rope and a HVAC unit and a box on top High above the western sky. I said I am only drinking a cup of joe right.
Well here is the story of the day!
When Jersey Shore Fitness moved into the old Bradley Mattress Factory on Brinley Avenue and the Railroad Greg and Fred had a brand new HVAC unit installed. Greg said he thinks it was about 16 years ago and it was a great old work horse but when he found out that they could get a better newer HVAC unit under a program NJ's Direct Install program, a comprehensive energy efficiency program that provides incentives towards whole-building energy improvements. Choose the component that best describes your building: Greg did it and Chose Hutchinson Mechanical Services of Cherry Hill NJ .
Jersey Shore Fitness not only takes care of your body but cares about our world too.
Systems and Equipment Addressed by the Program
Minimal Cost - Your share of the project’s cost will be approximately 40%, the program pays the remaining 60%. With incentives so dramatic, your upgrade project can pay for itself in less than two years.
Fast Turnaround Time - Project installations are typically completed within 60 days from the time of scheduling your Energy Assessment.
Ongoing Savings - Your new energy-efficient equipment will provide savings for years to come through dramatically reduced energy costs on your monthly utility bills.
So the crane was bring the old units down of the second floor roof.
and putting the new green high energy unit back up.
Thanks Jersey Shore Fitness for caring about Bradley Beach NJ.
Proud local owned business
For 30 years, supplying uninterrupted power to the
Jersey Shore, 24/7, 365 days a year."
No not that type of a crane! |
This Type! |
Well here is the story of the day!
When Jersey Shore Fitness moved into the old Bradley Mattress Factory on Brinley Avenue and the Railroad Greg and Fred had a brand new HVAC unit installed. Greg said he thinks it was about 16 years ago and it was a great old work horse but when he found out that they could get a better newer HVAC unit under a program NJ's Direct Install program, a comprehensive energy efficiency program that provides incentives towards whole-building energy improvements. Choose the component that best describes your building: Greg did it and Chose Hutchinson Mechanical Services of Cherry Hill NJ .
Jersey Shore Fitness not only takes care of your body but cares about our world too.
Let us pay up to 60% of your energy efficient upgrade
Sometimes, the biggest challenge to improving energy efficiency is knowing where to start and how to get through the process. Created specifically for existing small to medium-sized facilities, Direct Install is a turnkey solution that makes it easy and affordable to upgrade to high efficiency equipment. Direct Install is designed to cut your facility’s energy costs by replacing lighting, HVAC and other outdated operational equipment with energy efficiency alternatives. The program pays up to 60% of retrofit costs, dramatically improving your payback on the project.Eligibility
Existing small to mid-sized commercial and industrial facilities with a peak electric demand that did not exceed 200 kW in any of the preceding 12 months are eligible to participate in Direct Install. Buildings must be located in New Jersey and served by one of the state's public, regulated electric or natural gas utility companies.Systems and Equipment Addressed by the Program
- Lighting
- Heating, Cooling & Ventilation (HVAC)
- Refrigeration
- Motors
- Natural Gas
- Variable Frequency Drives
Benefits of Direct Install
Turnkey Process - A network of selected Participating Contractors address your project from start to finish, beginning with an assessment of your facility, and ending with the installation of eligible energy-efficient equipment.Minimal Cost - Your share of the project’s cost will be approximately 40%, the program pays the remaining 60%. With incentives so dramatic, your upgrade project can pay for itself in less than two years.
Fast Turnaround Time - Project installations are typically completed within 60 days from the time of scheduling your Energy Assessment.
Ongoing Savings - Your new energy-efficient equipment will provide savings for years to come through dramatically reduced energy costs on your monthly utility bills.
So the crane was bring the old units down of the second floor roof.
and putting the new green high energy unit back up.
Bye Home bye Bradley Beach Keep cool I will. |
Thanks Jersey Shore Fitness for caring about Bradley Beach NJ.
Proud local owned business
For 30 years, supplying uninterrupted power to the
Jersey Shore, 24/7, 365 days a year."
No comments:
Post a Comment